Language:

  • Santa Cruz Consortium receives technical visit

    DATE: 05/27/2022

    Published by: OEC

    On May 10, representatives of FURNAS and Eletrobrás clients made a technical visit to the construction site of the combined cycle shutdown works at Santa Cruz Thermoelectric Plant, underway in Rio de Janeiro.

    The project, which has almost 98% of its construction concluded, had its visit coordinated by the Generation Engineering Superintendence of FURNAS and counted with the presence of the team from the Generation Expansion Management Superintendence from Eletrobrás, as well as representatives from Santa Cruz Consortium.

    Currently, UTE Santa Cruz operates in open cycle through the burning of natural gas. With the implementation of the combined cycle, another 150 megawatts will be added to the plant’s nominal generation capacity, ensuring a final power output of at least 507 megawatts net – which will be possible through the thermal reuse from the two existing gas generating units.

    The works to increase energy generation capacity will not consume more fuel. Thus, there will be no increase in the emission of pollutant gases.

    No comments

    Want to learn more
    about the subject?

    Click here and leave you suggestion
    for the next post

    Related news

    +
    0
    OEC

    At the Barra do Dande Ocean Terminal, the MARITIME LOADING ARMS for ARMS 1 and 2 were assembled.   An...

    November 19, 2024
    +
    0
    OEC

    During the months of October and November, OEC Angola, in partnership with the BAI Academy, promoted leadership training with...

    November 19, 2024
    +
    0
    OEC

    On November 21, OEC Engenharia & Construção, one of the leading companies in its sector in Angola, celebrates 40...

    November 19, 2024
    +
    0

    After four months of virtual mentoring, the VOCÊ volunteer program, promoted by the Norberto Odebrecht Foundation (FNO) and OEC,...

    November 14, 2024