Language:

  • Nova BR: Ananindeua Terminal advances with the assembly of metal structures

    DATE: 07/09/2020

    Published by: Odebrecht Engineering & Construction

    The Ananindeua Integration Terminal, part of the NovaBR project, in the State of Pará, has been receiving metallic structures that weigh about 10 tons and will cover the three boarding and departure platforms of the Bus Rapid Transit (BRT) system and accessory bus lines at the Terminal. The works on BR-316 highway performed by the Government of Pará through the Metropolitan Transportation Management Center (NGTM)take place from the stretch between the Junction and the area near the entrance of the bridges and roads system named Alça Viária, in Marituba, 10.8 kilometers from the highway. The purpose is to implement the BRT system aiming at to expand urban mobility between the cities of Belém, Ananindeua and Marituba. In addition to the new drainage network, the project includes paving, bicycle lanes, tree-lined sidewalks, walkways, landscaping, and lighting.

    No comments

    Want to learn more
    about the subject?

    Click here and leave you suggestion
    for the next post

    Related news

    +
    0

    A conceptual project developed by Odebrecht Engenharia & Construção, proposing an integrated solution to enhance water security in the...

    April 09, 2026
    +
    0

    On March 29, QualiRun, the running and walking group promoted by the ViaSul Construction Consortium (CCVS), took part in...

    April 06, 2026
    +
    0

    The Cantareira Consortium, formed by Odebrecht Engineering & Construction and Renéa Infraestrutura, responsible for the construction of the Rodoanel...

    April 05, 2026
    +
    0

    President Luiz Inácio Lula da Silva and the Governor of Bahia, Jerônimo Rodrigues, authorized this Thursday (2) the start...

    April 02, 2026