Language:

  • OEC and Renea Infraestrutura open vacancies in the North Beltway project

    DATE: 01/23/2025

    Published by: OEC

    Opportunities are to work on the implementation of the northern section of the Governador Mário Covas Beltway, based in Guarulhos (SP) 

    São Paulo, January 2025 – The Cantareira Consortium, formed by the companies Odebrecht Engineering & Construction (OEC) and Renea Infraestrutura, has vacancies open for the construction of the northern section of the Governador Mário Covas Beltway, based in the city of Guarulhos (SP). Interested parties must send their resume informing the intended vacancy for the e-mail: vagasconsorciocantareira@consorciocantareira.com.br. 

    Vacancies are being offered for Production Assistant, Sharpener, Armorer, Carpenter, Civil Supervisor, Grader Operator, Linesman, Hammersmith, Munck Truck Driver, Board Truck Driver, Dump Truck Operator, Excavator Operator, Telescopic Handler Operator, Motor Grader, Backhoe Operator, Compactor Roller Operator, Bricklayer, Signal Rigger, Signalperson and Welder. 

    The opportunities are offered to people of all genders, including people with disabilities. Candidates must preferably reside in the cities of Arujá, Guarulhos, Itaquaquecetuba, Poá, São Paulo (preferably in the northern region of the capital) and Suzano. The selected individuals will receive benefits such as meals on site, transportation vouchers and chartered transportation, food vouchers and life insurance. The workday is from Monday to Thursday from 7 am to 5 pm and on Fridays from 7 am to 4 pm. 

    In view of the actions of fraudsters who offer false job openings with the demand for financial compensation, OEC and The Cantareira Consortium emphasize that no charge of money or any other compensation is required by companies for participation in their selection processes. Registration and any questions about the vacancies for this project should be addressed only through official e-mails, ending with the domains “@consorciocantareira.com.br”, “@oec-eng.com” or @renea.com.br”. For more information and clarification of doubts, watch the explanatory video. 

     

    About the Beltway – Northern Section 

    The expectation is that more than 44 thousand vehicles will circulate along the stretch daily, avoiding heavy truck traffic on urban roads and contributing to better traffic flow throughout the region. The scope of the project includes a total length of 44 km, with 18 km of four-lane roads, 26 km of three-lane roads, seven double tunnels, 107 special works of art, including bridges and viaducts, four stops for special loads, four bays for loads of dangerous products, two bases for the User Service, two general inspection posts and two weighing scales. The work includes civil works and tunnel systems, earthworks, containment works, drainage, paving, signage, among other services. 

    No comments

    Want to learn more
    about the subject?

    Click here and leave you suggestion
    for the next post

    Related news

    +
    0
    OEC

    OEC and Blank IT have just been awarded by Avalara Brasil for IT projects implemented in 2024. The two...

    January 23, 2025
    +
    0

    The Norberto Odebrecht Foundation held a draw for three kits of products made by projects supported by the entity...

    January 17, 2025
    +
    0

      OEC in Angola and the Norberto Odebrecht Foundation signed a Memorandum of Understanding (MoU) with the Agricultural Development...

    December 30, 2024
    +
    0
    OEC

    Built by OEC – Odebrecht Engenharia e Construção, the largest terminal of Transoeste is 61 times larger than the...

    December 30, 2024