Language:

  • PPP Saúde BH advances in works with seven simultaneous fronts

    DATE: 06/25/2020

    Published by: OEC

    After the completion of the first Health Center in the Cabana do Pai Tomás neighborhood, in Belo Horizonte, which has been in full operation since January 2020, PPP Saúde BH started the construction of the 39 remaining units provided for in the contract. Currently, work is taking place on five simultaneous service fronts and two more will start in early June.

    At the moment, more than 100 people work on the project, a number that is expected to grow to more than 600 when the work reaches its peak, scheduled for April 2021, when 27 service fronts will be operating at the same time. The next health units, in the neighborhoods of Boa Vista and Itaipú, should be completed by November this year.

    The work relies on the use of modern technology – the Light Steel Frame system, in which the concrete structures with structural masonry closures are replaced by a light galvanized steel structure, coated with plates ready to receive painting or coatings, allowing greater speed. in conclusion.

    The design of each unit includes two floors, 17 offices, a pharmacy, a dental room with six chairs for care, a vaccine room, a room for collecting material for exams, a nursing observation room, administrative areas and meeting rooms. In addition, it will have areas with 100% accessibility for people with reduced mobility.

    Accelerated video of the construction of the first Health Unit:

    No comments

    Want to learn more
    about the subject?

    Click here and leave you suggestion
    for the next post

    Related news

    +
    0
    OEC

    With a presence on major construction sites in Brazil and abroad, the company has adopted a digital system that...

    April 16, 2025
    +
    0
    OEC

    Last Thursday (10), the Rio de January state government signed the contract that will make it possible to resume...

    April 15, 2025
    +
    0
    OEC

    Enaex Brasil, one of the world’s leading producers of ammonium nitrate and Brazil’s largest explosives manufacturer, has recognized OEC...

    April 09, 2025
    +
    0
    OEC

     The Cantareira Consortium, responsible for the work on the northern section of the Rodoanel in São Paulo, has new job...

    April 09, 2025